top of page
BUILDING INFORMATION
Mink St Rendering.jpg

7409 MINK ST PATASKALA, OH

red-chip-farms PNG.png

JUNE 2024 ESTIMATED COMPLETION

CONSTRUCTION UPDATE

CONSTRUCTION UPDATE

Ground Breaking

Floor

Slab

Tilt

Walls

Steel Structure

& Deck

Roof

Complete

Site

Paving

Construction

Complete

BUILDING SPECIFICATIONS

Building Type

Building Size

SF Available

Office SF

Site Size

Clear Height

Column Spacing

Bay Size

Walls

 

Roof

 

Zoning

Interior Lighting

 

 

Electrical

Fire Protection

Floor Slab

Docks

Drive-in Doors

Truck Court & HD Drive Aisles

Trailer Parking

Car Parking

Net Lease Rate

Estimated Op.Ex.

Tax Abatement

Industrial/Warehouse

946,400 SF (1,456’ x 650’)

Up to 946,400 SF

1,600 ± SF spec office

83 ± acres

Minimum 40’ clear height, at the first bay column

56’ x 65’ speed bay; 56’ x 52’ interior bay

36,400 SF

Exterior walls painted tilt-up concrete, load bearing wall panels. Interior walls to have thermal insulation

60 mil, white, mechanically fastened TPO membrane system with R-25 insulation with twenty (20) year NDL warranty

PM (Planned Manufacturing) - City of Pataskala

Fixtures will be Aluminum body LED high bay fixtures, designed for 25 FC open floor storage throughout building. Includes 36 K lumen, rated life (L70 – 70% output) greater than 170,000 hours, with motion sensors

4,000 AMPS Total / 2 locations (2) 2,000A main switch gear at each end of the building. Building
to have conduits to accommodate an additional 2000 AMPS on each end of the building

ESFR fire protection system. System to utilize 50 PSI, K-25 heads. Includes a 2500 GPM, 300 HP  diesel fire pump. Interior Fire Pump House

8” 4000 PSI concrete slab atop 6 inches of stone

156 (9’x10’) dock doors 48 of the 156 doors will be equipped with 40,000 lb levelers, dock seals, dock light, and fan

4 (12’ x 14’) drive-in doors

The court will have a total depth of 200’ and constructed with 6-inch-thick 4000 psi unreinforced concrete; 12” high back curbs installed in truck court

210 trailer parking stalls will be available; 90 future trailer parking; 300 total parking

370 Base Building Main Entrance Parking; 125 Base Building Secondary Entrance Parking; 495 Base Building Parking; 495 Total Parking which includes base building and future parking

Market rents

$0.55/SF

15 year, 100% tax abatement on real property improvements

BUILDING SPECS
FLOOR PLAN

FLOOR PLAN

1B SITE PLAN UPDATED_edited.jpg
SITE OVERVIEW

SITE OVERVIEW

MASTER PLAN

master plan_edited.jpg
MASTER PLAN
site overview_edited.jpg

AREA ACCESS

area access_edited.jpg

CORPORATE NEIGHBORS

corporate neighbors_edited.jpg
AREA ACCESS
CORP NEIGHBORS
LABOR FORCE

LABOR FORCE

labor force_edited.jpg
MARKET ACCESS

MARKET ACCESS

national market access.jpg
CONTACT

CONTACT US

Colliers logo_USE THIS ONE.png

Shane Woloshan, SIOR

Vice Chair

+1 614 410 5624

shane.woloshan@colliers.com

red rock logo_edited.jpg

Leah Bailey, SIOR

Senior Vice President of Leasing

+1 704 619 3825

leah.bailey@colliers.com

bottom of page